I N S T A L L A T I O N I N S T R U C T I O N S
Large Flat Panel Wall Mount
Model: PRO-2000 Series
PRO-2000 Series Wall Mount Features:
•
Accommodates large flat screens weighing up to
200 lbs (90.7 kg).
•
Mounting brackets adapt to either 16" or 24" on
center dual stud wood framework; integrated
lateral shift adjusts ± 4.5" (16" on center) or ± 0.5"
(24" on center).
•
•
Infinite tilt and lock adjustment between 0-15
degrees.
Chief's exclusive Q-Latch mounting system
provides convenient and secure display connect/
disconnect; optional padlock provides additional
display security.
®
Q-Latch is a registered trademark of Chief Mfg.
! IMPORTANT: If the installation of this product requires
OSHPD seismic approval, refer to OSHPD pre-approval
documents and drawings before beginning installation.
OSHPD documents and drawings are available at
www.chiefmfg.com, and are also located on the product
information page for the mount.
PRO-2000 Series
BEFORE YOU BEGIN
CAUTION: To prevent damage to your monitor and PRO-2000, which could affect or void the Factory warranty,
thoroughly study all instructions and illustrations before you begin to install the mount. Pay particular attention to the
Warnings and Cautions in this document.
•
The mount is designed to be installed using wall studs or supporting framework. The fasteners used to anchor
the mount must be capable of supporting five times the total weight of the equipment.
•
•
The maximum weight to be installed on the PRO-2000 wall mount is 200 lbs (90.7 kg).
If you have any questions about this installation, contact Chief Manufacturing at 1-800-582-6480 or 952-582-
6480.
8805-000140 (Rev. E)
CHIEF MANUFACTURING INC.
1-800-582-6480 952-894-6280 FAX 952-894-6918
8401 EAGLE CREEK PARKWAY, STE 700
SAVAGE, MINNESOTA 55378 USA
¤2007 Chief Manufacturing
10/07
Installation Instructions
TOOLS REQUIRED FOR INSTALLATION
•
•
Drill and drill bit set
Socket wrench set
NOTE: Other tools may be required depending on your method of installation.
PARTS
Unpack carton, inspect and verify contents.
Read installation instructions completely. If any listed
parts are missing, contact Chief Customer Service at
1-800-582-6480.
10
20 - 4 Lag Bolts
Table 1: Parts
10
20
30
MOUNT, PRO-2000 Series
1
4
4
BOLT, Lag, 5/16" x 2-½"
WASHER, 5/16"
30 - 4 Washers
3
Installation Instructions
Wood Studs
INSTALLATION
MOUNT INSTALLATION
WARNING: It is the responsibility of the installer to
verify that the wall to which the mount is anchored will
safely support the combined load of all attached
components and equipment.
Wall
1. Determine approximate mounting location, keeping in
mind the display size.
NOTE: The mount is to be installed on dual wood studs
or other equivalent vertical or horizontal
supporting framework.
Pilot Holes
2. Use a stud sensor to locate the two wood studs. Mark
locations with a pencil.
3. With mount at desired height and located between the
marked studs, temporarily hang mount on wall by
installing a nail through the triangular hole located in
the center of the mount (See Figure 1). Ensure mount
is oriented such that pitch adjustment arms are at top
of mount.
Figure 2
Wood Studs
4. Level the mount and use a pencil to mark the location
of the four pilot holes. Ensure marks are in the center
of wood studs.
5. Remove mount from wall.
6. Drill four pilot holes using a 7/32" drill bit. Make sure
pilot holes are straight (See Figure 2).
7. While holding mount against wall, select appropriate
mounting holes:
•
16" on center studs: The mount can be installed
centered between the studs as shown (See
Figure 3), or it can be installed to the left or right
of center (See Figure 4).
•
24" on center studs: The mount must be centered
between the studs (See Figure 5).
8. Install four 5/16" x 2-½" lag bolts (20) and four 5/16"
washers (30) through mounting holes and into pilot
holes. Tighten all lag bolts.
Insert nail here
Figure 3
Figure 1
4
Installation Instructions
If an interface bracket for the display being mounted
needs to be obtained, or additional assistance is
required, contact a Chief Customer Service
representative by calling 1-800-582-6480 or by visiting
Wood Studs
(Left of Center Install)
To install the display:
1. Two Q-latches are installed on this mount. Make sure
both Q-Latches are in the UNLATCHED position
(See Figure 6).
Faceplate
UNLATCHED
Wood Studs
(Right of Center Install)
Q-Latch
Figure 4
Figure 6
2. While supporting each side of the display, align the four
mounting buttons on the interface bracket with the four
teardrop slots in mount faceplate. Lower bracket firmly
into slots. (See Figure 7)
Wood Studs
Faceplate
Display
Mounting
Button
Faceplate
Display
Figure 5
DISPLAY INSTALLATION
The following procedure assumes that the proper
interface bracket for the display being mounted has
already been installed on the display.
Mounting
Button
If no interface bracket is present on display, install
bracket to display using the instructions included with the
interface bracket before proceeding.
Figure 7
5
Installation Instructions
Tilt Adjustment Nuts
3. Secure display by rotating both Q-Latches to the fully
LATCHED position (See Figure 8). If one or both Q-
Latches do not fully engage, ensure the mounting
buttons are fully seated in the teardrop slots.
NOTE: A hole is provided in the Q-Latch and faceplate
to accommodate the insertion of a padlock or
similar locking device.
Faceplate
Display
LATCHED
Mounting
Button
Figure 9
Q-Latch
Figure 8
TILT ADJUSTMENT
CAUTION: Loosen the nut only. To avoid equipment
damage, do not remove the nut from the mount.
1. Using 1/2" socket wrench, loosen the tilt adjustment
nut on both arms of the mount (See Figure 9).
CAUTION: Do not over-tighten the nuts. Over-
tightening the nuts may cause excessive wear and may
damage your mount.
2. Tilt display to the desired position. Tighten both nuts.
REMOVE THE DISPLAY
1. Disconnect all power/audio/video cables.
2. UNLATCH both Q-Latches to unlock the display (See
Figure 8).
3. With the aid of another person, lift the display up and
out of the teardrop slots in the mount.